logo
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Options
View
Go to last post Go to first unread
grinding123  
#1 Posted : Tuesday, December 12, 2017 12:27:02 PM(UTC)
grinding123

Rank: Advanced Member

Groups: Registered
Joined: 10/24/2017(UTC)
Posts: 188

First, the material can contains a certain amount of water, but the moisture content should be controlled below 8%. Excessive moisture will cause the material bonding and reduce crushing efficiency, or possibly even result in stuck or motor burn down.
Then, check the motor and belt. The direction of turning should be consistent with the sand making machine sign after jog motor. If not, you should adjust the motor wiring to make the direction consistent with the sign. It is forbidden to work in wrong direction of turning. Besides, you should test the machine no-load prior to production, only with no problem can enter normal production.
Finally, feed size strictly in accordance with specification requirements of various models, and material which bigger than the specified materials is forbidden. Materials should be feeding uniformly. The sand making machine can working 8-24 hours in safe load, by the way, it should running in no-load almost at 4 hours.In addition, only the correct usage can extend the service life of equipment, thus reducing the cost, so daily caution should be done.
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.